Project development in Botswana

Project Development in Botswana

Most projects do not fail on the idea. They fail because the approvals were sequenced wrong, the specialists were appointed late, and the model was built before anyone priced the regulation.

What this is
Structured development from concept to implementation
Eight stages
Discovery through implementation
First gate
Environmental authorisation, EA Act 2011 s5(1)
Second gate
Land and surface rights, often a Land Board
Approach
Milestone based, with specialists coordinated

An opportunity is not a project. A project is an opportunity that has been tested, structured, sequenced, costed and given a route to implementation. Turning one into the other is what this page is about.

Three things fail Botswana projects repeatedly, and none of them is the underlying idea:

  • The approvals were sequenced wrong. Section 5(1) of the Environmental Assessment Act 2011 stops any licensing authority issuing a licence for a prescribed activity until environmental authorisation is in place. A project that treats environmental work as a parallel task discovers it is a gate.
  • The land was assumed. Much land is tribal land administered by a Land Board, with its own process and timeline. It is a counterparty, not a formality.
  • The model was built before the regulation was priced. Royalties, the Government working interest, tax treatment inside or outside a special economic zone, empowerment obligations on a public contract. Each changes the numbers, and a funder in Botswana will notice if they are missing.

Insika structures projects through a clear milestone-based approach so those three failures do not happen.

The eight stages

The sequence below is the one we run. Each stage produces something the next stage needs, and each has a decision point where stopping is a legitimate outcome.

  1. Project discovery

    Understanding the opportunity, the sector, the location and what you are actually trying to achieve. The output is a clear statement of the project and the questions that decide whether it is viable.

  2. Feasibility

    Commercial, regulatory and technical considerations assessed together, because in a regulated sector they determine one another. This is where a project should be stopped if it is going to be stopped.

  3. Project structure

    Scope, responsibilities, ownership structure and milestones. Ownership is a live design question in Botswana, where reserved trade categories, the 51 percent joint venture route and the 100 percent citizen condition on some funding each pull in different directions.

  4. Specialist appointment

    Bringing in the appropriate technical specialists, registered where registration is required, such as engineers certified by the Engineers Registration Board of Botswana.

  5. Documentation

    Preparing what the applications, the funders and the counterparties actually require, rather than a general project document that satisfies none of them.

  6. Regulatory process

    Coordinating submissions and engagement in the right order, with the environmental authorisation ahead of the sector licence as section 5(1) requires.

  7. Monitoring

    Tracking milestones, outstanding requirements and the things waiting on someone else. Most delay is not caused by a decision going badly, it is caused by nobody noticing a step stalled.

  8. Implementation

    Moving the project into execution, with the conditions attached to approvals turned into operating requirements.

Sequencing: what has to happen before what

Order is the part clients most often get wrong, and it is the cheapest thing to fix because it costs nothing but attention.

  • Environmental authorisation precedes the sector licence. Not alongside. Section 5(1) is explicit, and the process includes a public review of not less than 21 days that cannot be compressed. See environmental compliance.
  • Land runs in parallel with design, not after it. A Land Board process started once the design is complete adds its full duration to the programme instead of overlapping with it.
  • Ownership structure precedes funding applications. Because which institutions you can approach depends on it. CEDA requires 100 percent citizen ownership; a reserved trade category requires 51 percent; public procurement rewards local participation. See funding and investment.
  • A bankable feasibility study precedes a mining licence application, so scope the study to that standard at the outset rather than upgrading a lesser one later. See mining.
  • Grid connection and wheeling strategy precede a generation application, because they form part of it. See energy and green economy.
A simple test for whether a project is properly sequenced: ask what is currently the longest single item on the critical path, and who controls it. If the answer is an approval or a land process you have not started, the programme is optimistic rather than planned.
Rather have Insika handle your project development botswana? A consultant can take it from here, start to finish.
Book a Consultation

What a stage gate actually decides

Milestone-based development only works if a milestone can fail. Otherwise it is a schedule with optimistic labels.

At each gate the honest questions are:

  • Has anything changed the viability? A tariff, a regulation, a commodity price, an input cost.
  • Is the next stage funded? Development spend runs ahead of project finance, and running out of development capital mid-approval is a common and avoidable failure.
  • What have we learned that we did not assume? The purpose of a stage is to convert assumptions into facts. If it has not, it has not finished.
  • Is stopping the right answer? A project stopped at feasibility for a good reason has saved money. A project carried to application stage on hope has spent it.

We would rather tell a client at stage two that the project does not work than take fees through to stage six on a project that was never going to reach implementation.

Where project development gets applied

The method is sector-neutral, but the constraints differ by sector, and that is where the specific expertise sits.

  • Mining. The licence ladder, the bankable feasibility requirement, surface rights and the Government working interest under section 40.
  • Energy. Two approvals rather than one, grid connection, wheeling, and the 100 kW rooftop licensing line.
  • Petroleum. Seven licensable activities, and the storage condition now attached to import licences. See petroleum.
  • Manufacturing and industry. Industrial licensing, and whether the investment qualifies for the special economic zone regime. See manufacturing and industry.
  • Infrastructure. Public procurement, empowerment obligations and registered professional sign-off. See infrastructure and engineering.
  • Trade and logistics. Classification, origin, corridors and landed cost. See import and export.
Short on time for the project development botswana? Let our team do the application and the follow-ups for you.
Book a Consultation

What Insika is, and what it is not

Worth being direct, because project development is a term used loosely.

Insika is a consulting and project development firm. We assess, structure, coordinate, document and manage. We appoint and manage the specialists a project needs, and we run the regulatory engagement.

Insika is not a law firm, an environmental assessment practitioner, a firm of registered engineers, a contractor or a lender. Where a project needs those, we appoint appropriately qualified professionals and manage them as part of the programme. Professional sign-off comes from the registered professional who gives it.

Insika does not decide applications. Regulators and Ministers do, independently. What we control is whether what reaches them is complete, correctly sequenced and credible.

Government authorities make regulatory decisions independently, and Insika does not guarantee the outcome of any application. Requirements, fees and procedures change; we confirm current requirements with the relevant authority for each project rather than relying on published summaries.

Official sources

This guide is based on the current rules published by the relevant Botswana authorities. Always confirm the latest fees and requirements with the office that applies to you.

FAQ

Frequently asked questions

What is project development, as Insika uses the term?

Taking an opportunity through a structured sequence: discovery, feasibility, project structure, specialist appointment, documentation, regulatory process, monitoring and implementation. Each stage produces what the next needs, and each has a decision point where stopping is a legitimate outcome.

Why does sequencing matter so much in Botswana?

Because two gates sit ahead of everything else. Section 5(1) of the Environmental Assessment Act 2011 prevents any licensing authority issuing a licence for a prescribed activity until environmental authorisation is in place, and land is frequently tribal land administered by a Land Board with its own timeline. A project that treats either as a parallel task rather than a gate will stall.

What is the most common reason projects fail?

In our experience, not the idea. It is approvals sequenced in the wrong order, specialists appointed too late to influence design, and financial models built before anyone priced the regulatory costs. All three are preventable at the feasibility stage.

How early should the environmental process start?

As early as the project is defined enough to screen. It gates the sector licence, it includes a public review of not less than 21 days, and it may require a full impact assessment. Nothing is gained by delaying it and a great deal is lost.

Why does ownership structure come before funding?

Because it determines which institutions you can approach at all. CEDA requires 100 percent citizen ownership. A reserved trade category requires a joint venture with at least 51 percent Batswana ownership. Public procurement rewards local participation. A structure chosen for one of these may close the others, so it is a decision to take deliberately and early.

Will you tell us if a project is not viable?

Yes, and as early as we can. A project stopped at feasibility for a good reason has saved money. A project carried to application stage on hope has spent it. We would rather lose the later stages of a fee than take them on something that was never going to reach implementation.

Do you do the engineering and the environmental work yourselves?

No. We appoint and manage appropriately qualified professionals, including engineers certified by the Engineers Registration Board of Botswana and registered environmental practitioners. Professional sign-off comes from the professional who gives it. Our role is coordination, sequencing, documentation and management.

Can you take over a project that has already stalled?

Often, yes, and it is a common request. The first step is establishing what is actually blocking it, which is usually an approval that was started late or a requirement that was never identified. A short diagnostic is worth more than restarting the whole process.

How do you charge for project development?

Per project, quoted once the scope is clear, and normally structured by stage so you are not committing to the full programme before feasibility has told you whether there is one.

Do you guarantee the project will be approved?

No. Regulators and Ministers make those decisions independently. What we control is whether the project reaching them is complete, correctly sequenced and credible, and that is what materially changes the odds.

IC
The Insika Consulting team
Compliance, licensing and registration specialists

Insika Consulting Engineers works on mining, energy, petroleum, environmental, manufacturing and project development mandates in Botswana. Every guide on this site is written from the Act itself or the regulator's own published requirements, with the section cited on the page, and the same team can take an application through end to end.

Work spans company registration through CIPA, trade licensing, mining under the Mines and Minerals Act 1999, energy and petroleum licensing under BERA, environmental authorisation under the Environmental Assessment Act 2011, public procurement and investment readiness.

Reviewed and maintained by the Insika team. Last updated 2026-08-24.

Related services

Comply. Grow. Succeed.

Ready to get your project development botswana handled?

Book a free consultation and let Insika take the paperwork, the regulators and the follow-ups off your plate. You focus on the business, we keep it compliant.

Need this handled for you? Our team is one call away. Speak to a consultant